Central heating project in Hongdong County

Jinneng Hongdong thermal power plant in Zhaocheng Coal Chemical Industrial Park in the northeast of Hongdong county is adjusted to Guodian Huozhou Power Plant in Xinzhi town of Huozhou city according to the special plan for central heating in Hongdong county (2015-2030). The layout of long-distance heating pipeline and primary heating main network needs to be adjusted immediately. The long-distance heating pipeline is arranged along G108 national highway and S224 provincial highway from north to south, passing through ticun Township and Zhaozhou Towns, Hongdong County, Ganting Town, and finally reach Linfen City. The adjustment will bring the towns and villages along the way into the scope of heating.

1、 Planning scope and duration

The planning scope covers the county seat of Hongdong county and the villages and towns along the long-distance pipeline (ticun Township, Zhaocheng Town, Longma Township, Wan'an town and Ganting town).

2. Planning period:

Short term plan 2018-2020

Long term planning 2021-2030

Long term planning beyond 2030.

3、 Planning objectives

In the near future, the heating popularization rate of the county is 90%, and that of the towns and surrounding villages is 80%; in the long-term planning, the central heating coverage within the standard scope is basically complete.

4、 Heat source planning

It is planned that Huozhou Power Plant of Guodian is the main heat source of central heating in Hongdong County, Zhaocheng Town, Ganting Town, Dicun Township, Wan'an Town, Longma Township and surrounding villages in the near and long term. The Chengdong heat source plant in the county is used as the standby heat source for central heating in the county. No new boiler room shall be built in the urban area during the planning period. In the long term, the gas-fired boiler will be located in the east of the city, and the gas-fired boiler will be located in the south of the city.

5、 Pipe network layout

The pipe network of urban central heating system shall be laid according to the code for design of urban heating pipe network cjj34-2010. The heating pipe network adopts double pipe closed system, which is combined with branch and ring layout, that is, the main pipe network and branch line are circular, and the branch line is branch.

The long-distance heat supply pipeline project is divided into two sections from north to south, namely, from the heat source point (Huozhou Power Plant of Guodian) to Hongdong section, and from Hongdong to Ganting town to Linfen section.